What methods can be used to investigate what needs to change about the current system?
Questionnaires, Observations, Interviews and inspection of current records (paper based or computer based)
3 of 7
What is a feasibility report?
A feasibility report is a report made before the cycle starts to see if the upgrade is affordable and the benefits outweigh the costs. This will include details about what the user requires and details of the hardware and software the company has etc
4 of 7
What is Project Planning and in what stage would it be used?
Project planning is used in the design stage and is about handling the man power and when they need it, how long for why they need them and what they will be doing. They use tools like Gantt charts to plan out the timescale and resources needed.
5 of 7
What methods can be used to transfer the data from the old system to the new system?
The Direct Method, The Parallel Method, The Phased Method and The Pilot Method
6 of 7
What methods can be used to make sure/ maintain the best possible use of the system?
Corrective Maintenance, Adaptive Maintenance and Perfective Maintenance
7 of 7
Other cards in this set
Card 2
Front
What are the stages of the System Development Life Cycle?
Comments
No comments have yet been made