electrcial installation technology (27) 0.0 / 5 ? Othermicro renwable energyOtherNone Created by: lee42Created on: 07-03-20 22:35 What are 4 requirement when planning to install micro renwable system? legal, regulatory, building location, builidng fabric 1 of 13 is planning permission required to install micro hydro YES 2 of 13 what license is required to install micro hydro abstraction license 3 of 13 benfits of micro photo voltaic eco friendly, affordable, save money, low maintance cost 4 of 13 What is FIT in regards to solar energy? Feed IN Tariff, is an accelrate invetsment in renwable energy 5 of 13 What is grey water used for? Used for laundary, toilet flushing 6 of 13 can grey water be stored for a long time no longer than 24hrs 7 of 13 what is the benefit of GSHP? (geo thermal heat pump) safe,silient,out of sight 8 of 13 what is the disadvantage of GSHP? (geo thermal heat pump) expensive, disrupt garden 9 of 13 what is cicurlated around a ground loop? current 10 of 13 what is the biggest source of renwable energy in uk? wind 11 of 13 differnce betwwen standard boiler to micro CHP Micro CHP generates electricity when heating water 12 of 13 What do you need to install Micro CHP Microgenration certification scheme (MCS) 13 of 13
Comments
No comments have yet been made